St. Pauls Court – Structural Concrete & Crack Repairs

Concrete Repairs and masonry crack stitching repairs

Client

Synergize

Date

2024

Role

Concrete Repairs & Crack Stitching

Location

Gloucester

The Brief

This project involved extensive remedial works to three residential tower blocks at St. Pauls Court in Gloucester. Our scope included 75 individual concrete repairs to the upstands, each varying in size, as well as masonry repairs to address significant cracking across the blockwork. The brief required solutions that would restore both the integrity and visual appearance of the structures, with minimal disruption to residents on site.

Our Approach

We began by installing galvanised helibar stitching to stabilise the cracked masonry, followed by the application of CemTie remedial ties to reinforce compromised sections. Light gauge galvanised mesh was fixed to areas requiring additional support. All DPC operatives were CSCS certified, trained in asbestos awareness and manual handling, and had reviewed the site RAMS. Given the live, residential environment, we prioritised low-noise methods and used extraction systems to minimise dust, ensuring a safe and respectful working approach throughout.

The Results

Structural Integrity

Reinforced blockwork and restored concrete stability across all affected areas.

Quality Assurance

All work carried out by trained operatives with strict adherence to safety protocols.

Resident Consideration

Low-noise techniques and dust extraction used to minimise disruption.

Long-Term Durability

Crack stitching and remedial ties ensure sustained structural performance.

Satisfied Customer

Hi Derek,

Works signed off from the SE and payment has been lodged.

Thank you for the works you and your team have completed.

Will keep you in mind for the next project, about 15 minutes from this site. Starting at the end of this year.

Mike Scott

Senior Site Manager